15 questions on sWR, LWR/CWR, welding, USFD & rail fractures, each with the answer and where it comes from. Try each one before you tap Show answer.
Answer them against the clock and see your score with every answer explained.
Start the testQ1.In SWR track, the ballast shoulder on the outside of curves sharper than 875 m radius is increased to ______.
Answer: (C) 450 mm
For SWR, the outside shoulder is 400 mm on curves flatter than 875 m radius and 450 mm on sharper curves.
Source: RailPro e-book Vol 1, page 219
Q2.Indian railways have been divided into _____ number of Rail temperature zones.
Answer: (B) 4
Source: JE (P.Way) Question Bank 2025, Q.325
Q3.LWR with 60 kg rail on PSC sleeper with 1660 Sleeper Density, Limits of sharpest curvature, associated with steepest gradient for Zone I, II &III is ______________
Answer: (D) 50 with 1 in 65
Source: JE (P.Way) Question Bank 2025, Q.390
Q4.When a rail fracture occurred in LWR track, immediate work to be done is ___
Answer: (D) protect the track
Source: JE (P.Way) Question Bank 2025, Q.349
Q5.Action to be taken in case any flaw in USFD testing is classified as IMR/IMRW is
Answer: (A) Flawed portion should be replaced with a sound tested rail within 3 days
Source: JE (P.Way) Question Bank 2025, Q.469
Q6.In LWR/CWR at no time, not more than ______ sleepers spaces in a continuous stretch shall be opened for manual maintenance
Answer: (B) 30
Source: JE (P.Way) Question Bank 2025, Q.336
Q7.Which type of sleeper is described as best suited for LWR/CWR track?
Answer: (D) PSC concrete
Concrete sleepers' weight gives good longitudinal and lateral resistance, making them best suited for LWR/CWR.
Source: RailPro e-book Vol 1, page 139
Q8.While recording temperature at site during carrying out maintenance works, if the temperature shows in yellow zone on the rail thermometer, then action to be taken is
Answer: (B) Stop doing regular maintenance works & close the empty galas
Source: JE (P.Way) Question Bank 2025, Q.361
Q9.Renewal of fastenings in LWR requiring lifting of rail shall be carried out under the supervision of at least____________
Answer: (A) Mate
Source: JE (P.Way) Question Bank 2025, Q.377
Q10.Provisional Competency Certificate for TW-1 course shall be valid for executing _____ or ________ Whichever is earlier.
Answer: (B) 100 joints , 6 months
Source: JE (P.Way) Question Bank 2025, Q.454
Q11.New rails to be welded shall confirm to the tolerances stipulated in the specification _____________
Answer: (A) IRS-T-12
Source: JE (P.Way) Question Bank 2025, Q.412
Q12.Failure code for head, surface, breaking out running surface(scabbing) is _____
Answer: (C) 2221
Source: JE (P.Way) Question Bank 2025, Q.482
Q13.A welded rail that contracts and expands throughout its length, due to temperature variation is called______________
Answer: (B) SWR
Source: JE (P.Way) Question Bank 2025, Q.401
Q14.Two rail ends after lateral alignment for AT Welding when checked with one meter straight edge at rail ends shall be
Answer: (A) ± 0.5 mm
Source: JE (P.Way) Question Bank 2025, Q.428
Q15.In LWR/CWR track, sleeper density is expressed as ______.
Answer: (A) Number of sleepers per km
M+x notation is used for SWR/fish-plated track; for LWR/CWR density is given per km (e.g. 1340, 1540, 1660).
Source: RailPro e-book Vol 1, page 197