SWR, LWR/CWR, welding, USFD & rail fractures — questions with answers

15 questions on sWR, LWR/CWR, welding, USFD & rail fractures, each with the answer and where it comes from. Try each one before you tap Show answer.

Take these as a scored test

Answer them against the clock and see your score with every answer explained.

Start the test

Questions

Q1.In SWR track, the ballast shoulder on the outside of curves sharper than 875 m radius is increased to ______.

  1. 400 mm
  2. 350 mm
  3. 450 mm
  4. 550 mm
Show answer

Answer: (C) 450 mm

For SWR, the outside shoulder is 400 mm on curves flatter than 875 m radius and 450 mm on sharper curves.

Source: RailPro e-book Vol 1, page 219

Q2.Indian railways have been divided into _____ number of Rail temperature zones.

  1. 3
  2. 4
  3. 6
  4. 9
Show answer

Answer: (B) 4

Source: JE (P.Way) Question Bank 2025, Q.325

Q3.LWR with 60 kg rail on PSC sleeper with 1660 Sleeper Density, Limits of sharpest curvature, associated with steepest gradient for Zone I, II &III is ______________

  1. 6.50 with 1 in 100
  2. 60 with 1 in 80
  3. 50 with 1 in 100
  4. 50 with 1 in 65
Show answer

Answer: (D) 50 with 1 in 65

Source: JE (P.Way) Question Bank 2025, Q.390

Q4.When a rail fracture occurred in LWR track, immediate work to be done is ___

  1. impose SR
  2. replace Rail
  3. inform higher authority
  4. protect the track
Show answer

Answer: (D) protect the track

Source: JE (P.Way) Question Bank 2025, Q.349

Q5.Action to be taken in case any flaw in USFD testing is classified as IMR/IMRW is

  1. Flawed portion should be replaced with a sound tested rail within 3 days
  2. Clamped Joggled Fish plating should be done within 3 days
  3. Impose SR
  4. keep a watch
Show answer

Answer: (A) Flawed portion should be replaced with a sound tested rail within 3 days

Source: JE (P.Way) Question Bank 2025, Q.469

Q6.In LWR/CWR at no time, not more than ______ sleepers spaces in a continuous stretch shall be opened for manual maintenance

  1. 20
  2. 30
  3. 50
  4. 100
Show answer

Answer: (B) 30

Source: JE (P.Way) Question Bank 2025, Q.336

Q7.Which type of sleeper is described as best suited for LWR/CWR track?

  1. Wooden
  2. CST-9
  3. Steel trough
  4. PSC concrete
Show answer

Answer: (D) PSC concrete

Concrete sleepers' weight gives good longitudinal and lateral resistance, making them best suited for LWR/CWR.

Source: RailPro e-book Vol 1, page 139

Q8.While recording temperature at site during carrying out maintenance works, if the temperature shows in yellow zone on the rail thermometer, then action to be taken is

  1. Carry regular maintenance works
  2. Stop doing regular maintenance works & close the empty galas
  3. Introduce Hot Weather Patrolling
  4. None of the above
Show answer

Answer: (B) Stop doing regular maintenance works & close the empty galas

Source: JE (P.Way) Question Bank 2025, Q.361

Q9.Renewal of fastenings in LWR requiring lifting of rail shall be carried out under the supervision of at least____________

  1. Mate
  2. Keyman
  3. Gangman
  4. None of above
Show answer

Answer: (A) Mate

Source: JE (P.Way) Question Bank 2025, Q.377

Q10.Provisional Competency Certificate for TW-1 course shall be valid for executing _____ or ________ Whichever is earlier.

  1. 50 joints , 3 months
  2. 100 joints , 6 months
  3. 150 joints , 6 months
  4. 100 joints , 3 months
Show answer

Answer: (B) 100 joints , 6 months

Source: JE (P.Way) Question Bank 2025, Q.454

Q11.New rails to be welded shall confirm to the tolerances stipulated in the specification _____________

  1. IRS-T-12
  2. RB
  3. UIC
  4. RDSO
Show answer

Answer: (A) IRS-T-12

Source: JE (P.Way) Question Bank 2025, Q.412

Q12.Failure code for head, surface, breaking out running surface(scabbing) is _____

  1. 2211
  2. 2212
  3. 2221
  4. 2222
Show answer

Answer: (C) 2221

Source: JE (P.Way) Question Bank 2025, Q.482

Q13.A welded rail that contracts and expands throughout its length, due to temperature variation is called______________

  1. standard rail
  2. SWR
  3. LWR
  4. CWR
Show answer

Answer: (B) SWR

Source: JE (P.Way) Question Bank 2025, Q.401

Q14.Two rail ends after lateral alignment for AT Welding when checked with one meter straight edge at rail ends shall be

  1. ± 0.5 mm
  2. ± 0.6 mm
  3. ± 0.7 mm
  4. ± 0.8 mm
Show answer

Answer: (A) ± 0.5 mm

Source: JE (P.Way) Question Bank 2025, Q.428

Q15.In LWR/CWR track, sleeper density is expressed as ______.

  1. Number of sleepers per km
  2. M+4, M+5 etc.
  3. Sleepers per rail length
  4. Sleeper spacing in mm
Show answer

Answer: (A) Number of sleepers per km

M+x notation is used for SWR/fish-plated track; for LWR/CWR density is given per km (e.g. 1340, 1540, 1660).

Source: RailPro e-book Vol 1, page 197

‹ Track structure, materials & route classificationAll RailPro topicsCurves, cant & curve realignment ›

Preparing for AE / JE exams?
Get new civil engineering vacancies on Telegram, posted automatically every day. Free to join.
Join on Telegram ›