Start set 1 Start set 2Q1.Through Sleeper Renewal should be planned where, in continuous stretches, the sleepers qualifying for renewal are at least ______
Answer: (C) 30%
Where 30% or more sleepers qualify in continuous stretches, TSR is planned; otherwise scattered renewal is done.
Source: RailPro e-book Vol 2, page 481
Q2.Unserviceable material Class III - not fit for use– Ends to be painted with________ Paint
Answer: (A) a daub of Red
Source: JE (P.Way) Question Bank 2025, Q.1678
Q3.Minimum sleeper density for CTR/TSR with new PSC sleepers for Sidings (permissible speed more than 50 kmph)
Answer: (C) 1660
Source: JE (P.Way) Question Bank 2025, Q.1632
Q4.The limiting vertical wear (loss of head depth) for renewal of 60 kg rails is ______
Answer: (C) 13 mm
Vertical wear limits are 13 mm for 60 kg and 8 mm for 52 kg rails.
Source: RailPro e-book Vol 2, page 468
Q5.On the basis of rail fractures/failures, rail renewal is justified when withdrawals in a year reach ______
Answer: (D) 5 per 10 km
Five or more withdrawals per 10 km in a year due to fractures or USFD-detected flaws is a criterion for rail renewal.
Source: RailPro e-book Vol 2, page 466
Q6.During mechanized laying of track by TLE Speed restriction to be relaxed to 75 KMPH on ___ day after 2nd tamping in smoothening mode without DTS and after survey of track for design mode, ballasting, picking up of slacks and stabilisation of track by passage of traffic is
Answer: (B) 8th
Source: JE (P.Way) Question Bank 2025, Q.1671
Q7.Casual renewals are carried out as
Answer: (C) Both
Source: JE (P.Way) Question Bank 2025, Q.1550
Q8.Toe load testing of ERCs (outside corrosion-prone areas) is done after ______, whichever is earlier.
Answer: (D) 4 years or 200 GMT
ERCs are tested after four years or 200 GMT, whichever is earlier; in corrosion-prone areas the first test is after two years or 100 GMT.
Source: RailPro e-book Vol 2, page 484
Q9.Limiting lateral wear for rail renewal in Group C & D routes straight track
Answer: (B) 8mm
Source: JE (P.Way) Question Bank 2025, Q.1559
Q10.Laying tolerance of alignment on 10mts chord in straight track during primary renewals is
Answer: (C) ± 2mm
Source: JE (P.Way) Question Bank 2025, Q.1566
Q11.Track renewal proposals are initiated by the ADEN and submitted to ______
Answer: (A) the DEN
The ADEN submits proposals to the DEN, who personally checks them at site, then compiles and initiates the proposal with priorities.
Source: RailPro e-book Vol 2, page 506
Q12.As per the revised track maintenance norms, all loop lines should be deep screened once in ______
Answer: (D) 15 years
The revised norms retain the rule that all loop lines are deep screened once in 15 years.
Source: RailPro e-book Vol 2, page 535
Q13.Through Weld Renewal should be planned after the welds have carried what share of the stipulated GMT of the rails?
Answer: (C) 50%
As per Para 7.8.2.3 of the USFD Manual, TWR is planned after the welds have carried 50% of the rails' stipulated GMT.
Source: RailPro e-book Vol 2, page 499
Q14.For rails on important bridges and tunnels, including 100 m approaches on either side, the GMT service life for TRR is taken as ______ of the normal value.
Answer: (B) one-half
On important bridges, major bridges with bank height over 5.0 m, and tunnels with 100 m approaches, the GMT life is half of the specified value.
Source: RailPro e-book Vol 2, page 473
Q15.A through fastening renewal proposal should be initiated if 20% or more of the ERC sample records a toe load below ______
Answer: (A) 400 kg
If 20% or more of the sample shows toe load below 400 kg, confirmed by a 5% sample, through fastening renewal is proposed.
Source: RailPro e-book Vol 2, page 485
Q16.Higher sleeper density during TSR/CTR, Doubling, gauge conversion, new line construction works on main lines may be provided with approval of
Answer: (B) PCE
Source: JE (P.Way) Question Bank 2025, Q.1639
Q17.Scattered renewals are limited to not more than ______ in a gang beat in a year.
Answer: (B) 10 rails and/or 250 sleepers
Scattered renewals at isolated locations are limited to 10 rails and/or 250 sleepers per gang beat per year and form part of normal maintenance.
Source: RailPro e-book Vol 2, page 464
Q18.As per the Railway Board's revised track maintenance norms of July 2021, deep screening of main-line plain track on sections with a sectional speed of 130 kmph and above is due when the clean ballast cushion is less than ______.
Answer: (A) 200 mm
The 2021 revision (10th Extraordinary TSC, Board letter dated 16.07.2021) replaced the old '500 GMT or 10 years' rule. Main-line plain track is now deep screened when the clean cushion is below 200 mm on sections of 130 kmph and above, or below 150 mm on slower sections. Main-line turnouts are deep screened below 200 mm, and loop lines once in 15 years.
Source: RailPro e-book Vol 2, page 500
Q19.The revised service life of galvanised channel sleepers is ______, whichever is earlier, or on condition basis as decided by CTE.
Answer: (C) 14 years / 800 GMT
Galvanised channel sleeper life was revised from 14 years/400 GMT to 14 years/800 GMT; their rubber components stay at 400 GMT.
Source: RailPro e-book Vol 2, page 537
Q20.What is the limiting percentage loss of section for renewal of 60 kg rails?
Answer: (B) 7%
The limiting loss of section is 6% for 52 kg rails and 7% for 60 kg rails.
Source: RailPro e-book Vol 2, page 467
Q21.As per the 2021 revised norms, the service life of 60 kg switches is ______
Answer: (B) 300 GMT or condition basis
The life of 60 kg switches was revised from 200 GMT to 300 GMT or condition basis (52 kg switches: 250 GMT).
Source: RailPro e-book Vol 2, page 536
Q22.In Through Fitting Renewal (TFR), which components are renewed?
Answer: (C) Liners and GRSPs/CGRSPs only
TFR is done without replacing ERCs; only liners and GRSPs/CGRSPs are renewed.
Source: RailPro e-book Vol 2, page 464
Q23.Limiting loss of section due to wear on 52kg. Rail is ____%
Answer: (A) 6
Source: JE (P.Way) Question Bank 2025, Q.1543
Q24.As per the revised norms of 2021, plain main line track on a section with sectional speed of 130 kmph and above should be deep screened when the clean ballast cushion falls below ______
Answer: (C) 200 mm
For sectional speed of 130 kmph and above, deep screening is due when clean cushion is less than 200 mm (150 mm for sections below 130 kmph).
Source: RailPro e-book Vol 2, page 535
Q25.Before renewing switches, they may be reconditioned by approved means at most how many times?
Answer: (B) Three times
Reconditioning of switches should be explored to extend their life, but not more than three times.
Source: RailPro e-book Vol 2, page 492
Q26.While placing FM between two berthing lines (main and loops line or between two loop line) where points are involved, it must be ensured that glued joint is placed _______ mts inside FM for ensuring safety.
Answer: (B) 3.35
Source: JE (P.Way) Question Bank 2025, Q.1646
Q27.Service Life of GRSP in curve sharper than 5°
Answer: (D) 200 GMT or 2 years whichever is earlier or on condition basis
Source: JE (P.Way) Question Bank 2025, Q.1617
Q28.In track renewal terminology, a 'secondary' renewal is one in which ______
Answer: (A) released serviceable materials are used
Primary renewals use only new materials, while secondary renewals use released serviceable materials.
Source: RailPro e-book Vol 2, page 464
Q29.Lateral wear of rails is measured at what depth below the rail top table?
Answer: (D) 13 to 15 mm
Lateral wear is to be measured 13 to 15 mm below the rail top table.
Source: RailPro e-book Vol 2, page 470
Q30.During manual laying of sleepers Speed restriction to be relaxed to ______ on 3 rd day during opening, relaying and laying of sleepers manually and 1st round of machine packing followed by using DTS is
Answer: (B) 40 KMPH
Source: JE (P.Way) Question Bank 2025, Q.1663
Q31.As per IRPWM 2020 (and, under the 2021 revised norms, on routes not covered by rail grinding), the service life of 60 kg 90 UTS rails for considering through rail renewal, in terms of total GMT carried, is ______
Answer: (D) 800 GMT
IRPWM 2020 gives 800 GMT for 60 kg and 525 GMT for 52 kg 90 UTS rails (550 and 350 GMT are the 72 UTS values). The 2021 revised norms raised 60 kg 90 UTS rails to 1000 GMT only on routes covered by rail grinding.
Source: RailPro e-book Vol 2, page 473
Q32.As per the 2021 revised criteria, PSC sleepers are to be renewed ______
Answer: (D) on condition basis (rail seat grooving, insert corrosion, cracking in continuous stretches, etc.) as decided by CTE
The fixed life of 2000 GMT or 35 years was replaced by renewal on condition basis, such as rail seat grooving, insert corrosion or cracking, as decided by CTE.
Source: RailPro e-book Vol 2, page 536
Q33.On routes covered by rail grinding, the revised service life of 60 kg 90 UTS rails is ______
Answer: (A) 1000 GMT
The 2021 revision raised the life of 60 kg 90 UTS rails on rail-grinding routes from 800 GMT to 1000 GMT; other routes keep the existing criteria.
Source: RailPro e-book Vol 2, page 535
Q34.Through Rail Renewal is also permitted where defective welds per track km exceed ______
Answer: (A) 30
TRR is allowed at locations having more than 30 defective welds per track km.
Source: RailPro e-book Vol 2, page 466