Estimates, SOR, tenders & contracts — questions with answers

15 questions on estimates, SOR, tenders & contracts, each with the answer and where it comes from. Try each one before you tap Show answer.

Take these as a scored test

Answer them against the clock and see your score with every answer explained.

Start the test

Questions

Q1.Under GCC Clause 8, the successful tenderer must execute the contract agreement within ______ of notice that it is ready.

  1. 15 days
  2. 30 days
  3. 21 days
  4. 7 days
Show answer

Answer: (D) 7 days

Clause 8: the agreement is executed within seven days of notice, and only after a valid Performance Guarantee is submitted.

Source: RailPro e-book Vol 3, page 289

Q2.When negotiations are held on a works tender, they are held with ______

  1. The three lowest tenderers
  2. All eligible tenderers
  3. Any tenderer chosen by the TC
  4. The L1 tenderer only
Show answer

Answer: (D) The L1 tenderer only

Negotiations are held only with L1, the valid, eligible, technically acceptable tenderer with the lowest value.

Source: RailPro e-book Vol 3, page 269

Q3.In a six-digit IRUSSOR item number, what do the first two digits (from the left) indicate?

  1. Sub-item
  2. Main item number
  3. Sub-group
  4. Chapter number
Show answer

Answer: (D) Chapter number

The first two digits give the chapter (01–21), then one digit sub-group, two digits main item and the last digit the sub-item.

Source: RailPro e-book Vol 3, page 204

Q4.From 26.11.2019, which schedule of rates applies to railway building, road and horticulture works?

  1. IRUSSOR-2019
  2. Zonal SOR 2010
  3. CPWD Delhi Schedule of Rates (DSR)
  4. State PWD SOR
Show answer

Answer: (C) CPWD Delhi Schedule of Rates (DSR)

The Railway Board adopted the CPWD DSR for building, road and horticulture works; IRUSSOR-2019 covers formation, bridge and P.Way works.

Source: RailPro e-book Vol 3, page 196

Q5.Who is the authority to ban the execution of a particular IRUSSOR item on a Zonal Railway?

  1. PCE
  2. GM
  3. DRM
  4. EDCE(G), Railway Board
Show answer

Answer: (A) PCE

The PCE may ban unsuitable items by letter, with a copy to EDCE(G), Railway Board.

Source: RailPro e-book Vol 3, page 207

Q6.As per Engineering Code para 1219, works and supplies on contract should preferably be executed according to ______

  1. Approved samples
  2. The contractor's own drawings
  3. Standard specifications and drawings
  4. Verbal instructions of the Engineer
Show answer

Answer: (C) Standard specifications and drawings

Para 1219: execution should follow standard specifications and drawings wherever possible, rather than samples.

Source: RailPro e-book Vol 3, page 215

Q7.If L1 withdraws before the work order is placed, what should be done?

  1. Award to L2 at L1's rates
  2. Re-tender
  3. Negotiate with L2
  4. Award to L2 at its own rates
Show answer

Answer: (B) Re-tender

As per CVC instructions, if L1 withdraws before the work order or execution, the work should be re-tendered.

Source: RailPro e-book Vol 3, page 273

Q8.In the Analysis of Rates under IRUSSOR-2019, contractor's profit and overheads are taken at ______

  1. 10%
  2. 15%
  3. 12%
  4. 20%
Show answer

Answer: (B) 15%

AOR components include contractor's profit and overheads at 15% (water charges 1%, cess 1%).

Source: RailPro e-book Vol 3, page 212

Q9.The comparative statement of tenders (para 1252) is prepared by ______

  1. The Accounts Department and checked by the Executive
  2. The Tender Committee
  3. The Executive Branch and verified by Accounts
  4. The Accepting Authority
Show answer

Answer: (C) The Executive Branch and verified by Accounts

Para 1252: the Executive Branch prepares it, Accounts verifies it, and all tenders are tabulated without screening.

Source: RailPro e-book Vol 3, page 243

Q10.Zonal Railways must update the 'Basic Rates' sheet of IRUSSOR-2019 at least once in ______

  1. two years
  2. one year
  3. three years
  4. five years
Show answer

Answer: (A) two years

Basic rates are updated with Associate Finance concurrence at least once in two years, so each zone has an updated USSOR every two years.

Source: RailPro e-book Vol 3, page 199

Q11.Under IRUSSOR-2019, design mix concrete from M-15 to M-40 is paid ______

  1. At a rate rising with grade
  2. Only for M-25 and above
  3. At the same rate irrespective of grade
  4. At nominal-mix rates
Show answer

Answer: (C) At the same rate irrespective of grade

All design mix grades M-15 to M-40 are paid at the same rate; the grade is for guidance and the site grade is stated in the BOQ.

Source: RailPro e-book Vol 3, page 202

Q12.If there are multiple L1 tenderers, the tender may be awarded to the one with ______

  1. Higher bid capacity
  2. Earlier submission time
  3. Larger EMD
  4. Lower turnover
Show answer

Answer: (A) Higher bid capacity

Higher bid capacity decides; if that is also equal, the one that did more similar work in the last three financial years and the current year is chosen.

Source: RailPro e-book Vol 3, page 274

Q13.Under GCC Clause 22(5), within how many days can a contractor appeal to the Chief Engineer against the Engineer's decision on the meaning of specifications or drawings?

  1. 15 days
  2. 30 days
  3. 3 days
  4. 7 days
Show answer

Answer: (D) 7 days

The appeal lies to the CE within 7 days of the decision being intimated; the CE's decision is final (an excepted matter).

Source: RailPro e-book Vol 3, page 225

Q14.If a tenderer is found to have submitted wrong credential information, the agency is barred from business on the entire Indian Railways for ______

  1. 5 years
  2. 1 year
  3. 2 years
  4. 10 years
Show answer

Answer: (A) 5 years

The contract is terminated, EMD/PG/SD are forfeited and the agency is barred for 5 years.

Source: RailPro e-book Vol 3, page 278

Q15.How many chapters does IRUSSOR-2019 contain for formation, bridge and P.Way works?

  1. 15
  2. 18
  3. 24
  4. 21
Show answer

Answer: (D) 21

IRUSSOR-2019 consists of 21 chapters covering formation, bridge and P.Way works.

Source: RailPro e-book Vol 3, page 198

‹ Works programme, plans & drawingsAll RailPro topicsRailway land, licensing & NOCs ›