Nirmaanpro
Advertisement Advertise your business here Reach civil engineering students and professionals across India · contact@nirmaanpro.shop

RailPro › Working, staff & safety

RailPro · Working, staff & safety

Level crossings & gatemen — questions with answers

38 questions on level crossings & gatemen, each with the answer and where it comes from. Try each one before you tap Show answer.

Take these as a scored test

Answer them against the clock and see your score with every answer explained.

Start set 1 Start set 2

Questions

Q1.Under Section 146 of the Railways Act 1989, wilfully obstructing a railway servant in his duties is punishable with imprisonment up to ______.

  1. One month
  2. Six months
  3. One year
  4. Three years
Show answer

Answer: (B) Six months

Section 146 provides imprisonment up to six months, or fine up to Rs 1000, or both.

Source: RailPro e-book Vol 2, page 775

Q2.The competency certificate of a gatekeeper at an engineering level crossing is countersigned by ______.

  1. AOM
  2. ADEN
  3. Sr. DEN/Co
  4. DRM
Show answer

Answer: (B) ADEN

For engineering gates the certificate is issued by SSE/P.Way or the Divisional Training Centre (and SSE/Sig for interlocked gates) and countersigned by ADEN.

Source: RailPro e-book Vol 2, page 675

Q3.In computing road vehicle units for TVU, a motorcycle or two-wheeler is counted as ______.

  1. 1/2 unit
  2. 1 unit
  3. Not counted
  4. 1/4 unit
Show answer

Answer: (D) 1/4 unit

Motor vehicles, bullock carts and tongas are 1 unit, cycle-rickshaws/autos are 1/2 unit and two-wheelers are 1/4 unit.

Source: RailPro e-book Vol 2, page 807

Q4.A level crossing laid with PSC sleepers is overhauled with each cycle of machine packing, but in no case should its opening be delayed beyond ______.

  1. One year
  2. Three years
  3. Five years
  4. Two years
Show answer

Answer: (D) Two years

LCs with PSC sleepers are overhauled with each machine packing cycle and in no case should opening be delayed by more than two years.

Source: RailPro e-book Vol 2, page 749

Q5.When a gateman notices that a passing train has parted, what should he do?

  1. Show a red stop hand signal
  2. Place detonators on the line
  3. Close the gate and inform the SM
  4. Attract attention by shouting or gesturing
Show answer

Answer: (D) Attract attention by shouting or gesturing

On train parting, the gateman must not show a stop hand signal but should attract the attention of driver and guard by shouting, gesticulating or other means.

Source: RailPro e-book Vol 2, page 836

Q6.Height gauges on electrified sections should be located at a minimum distance of ______ from the gate posts.

  1. 5 m
  2. 6 m
  3. 8 m
  4. 15 m
Show answer

Answer: (C) 8 m

Height gauges are placed at least 8 m from the gate posts; in exceptional cases PCE may permit a minimum of 8 m from the centre line of track.

Source: RailPro e-book Vol 2, page 800

Q7.Range of Vertical clearance between the underside of the top member of the height gauge and the road surface is _______.

  1. 4.76 to 4.78m
  2. 4.65 to 4.78m
  3. 4.65 to 4.76m
  4. 4.70 to 4.76m
Show answer

Answer: (A) 4.76 to 4.78m

Source: JE (P.Way) Question Bank 2025, Q.873

Q8.Types of level crossings, what is skew type level crossing

  1. intersection of centre line of road and railway track is greater than 90°
  2. intersection of centre line of road and railway track is greater than 45° & less than 90°
  3. intersection of centre line of road and railway track is equal to 90°
  4. intersection of centre line of road and railway track is less than 90°
Show answer

Answer: (B) intersection of centre line of road and railway track is greater than 45° & less than 90°

Source: JE (P.Way) Question Bank 2025, Q.739

Q9.For a level crossing on a National or State Highway, the speed breaker warning board is placed at what distance from the speed breaker?

  1. 40 m
  2. 60 m
  3. 120 m
  4. 90 m
Show answer

Answer: (C) 120 m

Speed breaker boards are placed 120 m ahead on NH/SH, 90 m on major district roads, 60 m on other district roads and 40 m on rural roads.

Source: RailPro e-book Vol 2, page 727

Q10.For plain closure of a low-TVU level crossing having no road on either side, whose consent is required?

  1. Commissioner of Railway Safety
  2. District Magistrate
  3. Railway Board
  4. State PWD
Show answer

Answer: (B) District Magistrate

Such LCs can be closed directly; CRS sanction is no longer required but the DM's consent is needed.

Source: RailPro e-book Vol 2, page 894

Q11.What is the normal position of the gates at an interlocked level crossing?

  1. Open to road traffic
  2. Closed to road traffic
  3. Closed during night only
  4. As decided by the gateman
Show answer

Answer: (A) Open to road traffic

All interlocked LCs are kept normally open to road traffic and are closed for trains only for taking off the signals.

Source: RailPro e-book Vol 2, page 683

Q12.In emergency sliding boom operation, which key is used to give signal (or the slot to the ASM) after both booms are locked?

  1. Green-painted key
  2. Yellow-painted key
  3. Red-painted key
  4. Blue-painted key
Show answer

Answer: (A) Green-painted key

After both booms are locked, the third key (painted green) is released and used to take off signal or give slot to the ASM.

Source: RailPro e-book Vol 2, page 795

Q13.If check rails at a level crossing cannot be refixed and trains have to be passed, what speed restriction is imposed?

  1. 10 km/h
  2. 20 km/h
  3. 30 km/h
  4. 50 km/h
Show answer

Answer: (C) 30 km/h

A speed restriction of 30 km/h is imposed, and the check rails must be refixed by close of the next day with a watchman posted meanwhile.

Source: RailPro e-book Vol 2, page 751

Q14.Under Section 160(1) of the Railways Act 1989, a person (other than authorised) who opens a closed LC gate or barrier is punishable with imprisonment up to ______.

  1. Six months
  2. Three years
  3. One year
  4. Five years
Show answer

Answer: (B) Three years

Opening a gate/chain/barrier closed to road traffic attracts imprisonment up to three years; breaking it attracts up to five years.

Source: RailPro e-book Vol 2, page 776

Q15.Diameter of STOP board disc at Level crossing is ______ mm

  1. 1000
  2. 500
  3. 600
  4. 300
Show answer

Answer: (C) 600

Source: JE (P.Way) Question Bank 2025, Q.772

Q16.The ADEN should inspect the equipment at every manned level crossing in the sub-division once in ______.

  1. Six months
  2. One month
  3. Three months
  4. One year
Show answer

Answer: (A) Six months

ADEN inspects the equipment at every manned LC once in six months and examines the gateman in rules.

Source: RailPro e-book Vol 2, page 762

Q17.Beyond the level portion outside the gates of a Class I road, the road gradient should not be steeper than ______.

  1. 1 in 15
  2. 1 in 40
  3. 1 in 20
  4. 1 in 30
Show answer

Answer: (B) 1 in 40

For Class I roads the level length outside gates is 15 m and the gradient beyond should not be steeper than 1 in 40 (Class II 1 in 30, Class III 1 in 20).

Source: RailPro e-book Vol 2, page 732

Q18.As per the LC census procedure, how often is the census of all level crossings taken?

  1. Once in 3 years
  2. Every year
  3. Once in 2 years
  4. Once in 5 years
Show answer

Answer: (A) Once in 3 years

Periodical census of all LCs is taken once in 3 years over a period of 7 days to work out TVU.

Source: RailPro e-book Vol 2, page 806

Q19.Minimum straight length of Road from the gate post should be required for class-III road is ______

  1. 22.5m
  2. 15.0m
  3. 9.0m
  4. 4.5m
Show answer

Answer: (D) 4.5m

Source: JE (P.Way) Question Bank 2025, Q.856

Q20.A level crossing with a TVU of more than 50,000 is classified as ______.

  1. Special class
  2. 'A' class
  3. 'B1' class
  4. 'C' class
Show answer

Answer: (A) Special class

As per the LC classification, crossings with TVU above 50,000 are Special class; 'A' class covers TVU from 30,000 to 50,000.

Source: RailPro e-book Vol 2, page 664

Q21.What is the permissible range of clearance between the check rail and running rail at a level crossing?

  1. 51 to 57 mm
  2. 41 to 45 mm
  3. 44 to 48 mm
  4. 60 to 65 mm
Show answer

Answer: (A) 51 to 57 mm

Check rail clearance at LCs is kept between 51 and 57 mm with a minimum clear depth of 38 mm.

Source: RailPro e-book Vol 2, page 744

Q22.Road intersects with the railway track at same level is called ______

  1. Level crossings
  2. Grade separators
  3. Road over bridge
  4. Road under bridge
Show answer

Answer: (A) Level crossings

Source: JE (P.Way) Question Bank 2025, Q.705

Q23.At an LC, the daily average is 40 trains, 300 motor vehicles, 200 auto-rickshaws and 400 two-wheelers. What is the TVU?

  1. 16,000
  2. 26,000
  3. 20,000
  4. 36,000
Show answer

Answer: (C) 20,000

Road units = 300 + 200x0.5 + 400x0.25 = 500; TVU = train units x road vehicle units = 40 x 500 = 20,000.

Source: RailPro e-book Vol 2, page 806

Q24.Minimum length of Check rail in square LC is width of Gate + ______

  1. 1.5 m
  2. 1.25 m
  3. 2 m
  4. 0.5 m
Show answer

Answer: (C) 2 m

Source: JE (P.Way) Question Bank 2025, Q.806

Q25.How many detonators are provided as safety equipment at a manned level crossing?

  1. 4
  2. 6
  3. 10
  4. 12
Show answer

Answer: (C) 10

The equipment list for a manned LC includes 10 detonators (C.S. No. 135).

Source: RailPro e-book Vol 2, page 700

Q26.For A-III medical if the employee age is between 45 to 55 years he has to attend PME once in _____ years

  1. 2
  2. 4
  3. 3
  4. 1
Show answer

Answer: (A) 2

Source: JE (P.Way) Question Bank 2025, Q.755

Q27.Who decides to change the normal position of a non-interlocked manned gate from 'closed to road traffic' to 'open to road traffic'?

  1. GM, with approval of Railway Board
  2. ADEN, with approval of Sr. DOM
  3. CRS, on proposal of DRM
  4. DRM, with approval of PCE and COM
Show answer

Answer: (D) DRM, with approval of PCE and COM

As per Board's 2012 letter, the decision is taken by DRM with the approval of PCE and COM after fulfilling the stipulated conditions.

Source: RailPro e-book Vol 2, page 686

Q28.How often should the JE/SSE/P.Way check the equipment with the gateman, by rotation?

  1. Once a fortnight
  2. Once a month
  3. Once a quarter
  4. Once in six months
Show answer

Answer: (B) Once a month

The JE/SSE/P.Way checks gateman's equipment once a month by rotation and also makes surprise day/night inspections.

Source: RailPro e-book Vol 2, page 759

Q29.What is the policy for providing a new crossing of a National Highway or State Highway with a railway line?

  1. A manned interlocked LC is sufficient
  2. A manned LC with lifting barrier
  3. Grade separator only
  4. Unmanned LC with whistle boards
Show answer

Answer: (C) Grade separator only

On NH, SH, their bypasses and important city roads only grade separators are provided; relaxation requires Railway Board's prior approval.

Source: RailPro e-book Vol 2, page 663

Q30.For a skew level crossing, the required check rail length X is obtained from which formula (L = length at right angles to road centre line, A = angle between road and railway centre lines)?

  1. X = L x sin A
  2. X = L / cos A
  3. X = L x tan A
  4. X = L / sin A
Show answer

Answer: (D) X = L / sin A

For skew crossings the check rail length is increased as X = L / sin A.

Source: RailPro e-book Vol 2, page 753

Q31.A gatekeeper posted at an engineering level crossing must be medically fit in which category?

  1. A-1
  2. A-3
  3. A-2
  4. B-1
Show answer

Answer: (B) A-3

Gatekeepers of engineering gates must be medically fit in A-3 category (traffic-gate GKs are A-2).

Source: RailPro e-book Vol 2, page 675

Q32.On running train, gateman has seen Smoke or Fire then he has to show _______ Flag/Light to the Guard.

  1. White
  2. Green
  3. Red
  4. None
Show answer

Answer: (C) Red

Source: JE (P.Way) Question Bank 2025, Q.789

Q33.For class-I road in hilly country, the speed breaker warning indicator for the road users should be fixed at a distance of ______ from speed breaker (as per IRPWM)

  1. 200m
  2. 120m
  3. 90m
  4. 60m
Show answer

Answer: (D) 60m

Source: JE (P.Way) Question Bank 2025, Q.823

Q34.What is the validity of the competency certificate of a gatekeeper working at a traffic level crossing gate?

  1. 1 year
  2. 2 years
  3. 3 years
  4. 5 years
Show answer

Answer: (C) 3 years

For traffic gates the competency certificate (issued by TI and SSE/Sig for interlocked gates, countersigned by AOM) is valid for 3 years.

Source: RailPro e-book Vol 2, page 673

Q35.Minimum number of Gate Keepers per 24 hrs for A-Class level crossing is

  1. 5
  2. 4
  3. 3
  4. 2
Show answer

Answer: (D) 2

Source: JE (P.Way) Question Bank 2025, Q.840

Q36.If TVUs less than 25000 and up to 10000 then _______ class Level crossing.

  1. A
  2. B1
  3. B2
  4. C
Show answer

Answer: (C) B2

Source: JE (P.Way) Question Bank 2025, Q.722

Q37.Under which rule, if any person breaks any gate or Chain or Barrier set up on either side of a Level Crossing which is closed to road traffic, he shall be punishable with imprisonment for a term which may extend to five years.

  1. section-146 of IR act 1989
  2. section-149 of IR act 1989
  3. section-160(1) of IR act 1989
  4. section-160(2) of IR act 1989
Show answer

Answer: (D) section-160(2) of IR act 1989

Source: JE (P.Way) Question Bank 2025, Q.890

Q38.Manning and operation of LC gates located within the outermost stop signals of a station are under the control of which department?

  1. Engineering department
  2. S&T department
  3. Commercial department
  4. Operating (Traffic) department
Show answer

Answer: (D) Operating (Traffic) department

Gates within the outermost stop signals are traffic gates manned and operated by the Operating department; their civil infrastructure is maintained by Engineering.

Source: RailPro e-book Vol 2, page 672

‹ Material trains & working of track machinesAll RailPro topicsPatrolling of the line ›

Preparing for AE / JE exams?
Get new civil engineering vacancies on Telegram, posted automatically every day. Free to join.
Join on Telegram ›