Nirmaanpro
Advertisement Advertise your business here Reach civil engineering students and professionals across India · contact@nirmaanpro.shop

RailPro › Working, staff & safety

RailPro · Working, staff & safety

Material trains & working of track machines — questions with answers

12 questions on material trains & working of track machines, each with the answer and where it comes from. Try each one before you tap Show answer.

Take these as a scored test

Answer them against the clock and see your score with every answer explained.

Start the test

Questions

Q1.If more than one track machine is programmed to go into the block section and then proceed further to the next block station, the first one will be given _______ and the last one will be given ________.

  1. Caution order and T/465
  2. T/465 and Caution order
  3. Caution order and T/A 465
  4. T/A 465 and Caution order
Show answer

Answer: (C) Caution order and T/A 465

Source: JE (P.Way) Question Bank 2025, Q.689

Q2.While unloading of ballast with BOBYN, after clearing block section, it is recommended that a speed restriction of _______ be imposed for the first ______ trains which passes over the portion where ballast had been unloaded

  1. 30 kmph for one train
  2. 45 kmph for one train
  3. 30 kmph for two trains
  4. 45 kmph for two trains
Show answer

Answer: (B) 45 kmph for one train

Source: JE (P.Way) Question Bank 2025, Q.704

Q3.When mixed units (i.e. Material train, track machine and tower wagon) should be work into same block section, they shall maintain speed ________ when view is clear and during day time

  1. 8 kmph
  2. 15 kmph
  3. 25 kmph
  4. 40 kmph
Show answer

Answer: (B) 15 kmph

Source: JE (P.Way) Question Bank 2025, Q.695

Q4.During shadow block, _____ can be permitted in the block section.

  1. No material train
  2. One material train only
  3. Two material trains
  4. More than two material trains
Show answer

Answer: (B) One material train only

Source: JE (P.Way) Question Bank 2025, Q.667

Q5.Who is the authority to order a material train for carriage of railway material when picked or put down for execution of works, either between stations or within station limits

  1. DOM
  2. DEN
  3. SSE/P.Way
  4. none of these
Show answer

Answer: (A) DOM

Source: JE (P.Way) Question Bank 2025, Q.653

Q6.While unloading of ballast, direct unloading of ballast on ________ lines should not be undertaken

  1. Siding
  2. Points and crossings
  3. Inside of curves
  4. Platform lines
Show answer

Answer: (D) Platform lines

Source: JE (P.Way) Question Bank 2025, Q.700

Q7.Before starting a Material train from station, the Guard should ensure that

  1. sufficient labour is available
  2. Labour is having required tools
  3. train is equipped with requisite brake power
  4. none of these
Show answer

Answer: (C) train is equipped with requisite brake power

Source: JE (P.Way) Question Bank 2025, Q.657

Q8.Blocking of a portion of line for engineering purposes wherein no traffic is permitted except Material trains and Track Machines is called as _______

  1. Block section
  2. Track block
  3. Line block
  4. Power block
Show answer

Answer: (C) Line block

Source: JE (P.Way) Question Bank 2025, Q.662

Q9.Pushing of a material train is not permitted on a gradient steeper than

  1. 1 in 200
  2. 1 in 100
  3. 1 in 50
  4. none of these
Show answer

Answer: (B) 1 in 100

Source: JE (P.Way) Question Bank 2025, Q.671

Q10._______ is the minimum competent authority to work with the Track machine

  1. Trolley man
  2. Gang mate
  3. JE/P.Way
  4. SSE/P.Way
Show answer

Answer: (C) JE/P.Way

Source: JE (P.Way) Question Bank 2025, Q.680

Q11.When the engine is pushing and brake van is leading the speed of the material train on straight track is ____ and on turnout track is _____ as per G&SR

  1. 15 kmph & 10 kmph
  2. 25 kmph & 10 kmph
  3. 15 kmph & 8 kmph
  4. 25 kmph & 8 kmph
Show answer

Answer: (D) 25 kmph & 8 kmph

Source: JE (P.Way) Question Bank 2025, Q.676

Q12.Refresher course for Track machine operator technical training at IRTMTC is once in

  1. 1 year
  2. 2 years
  3. 3 years
  4. 5 years
Show answer

Answer: (C) 3 years

Source: JE (P.Way) Question Bank 2025, Q.685

‹ Trolleys, lorries & rail dolliesAll RailPro topicsLevel crossings & gatemen ›

Preparing for AE / JE exams?
Get new civil engineering vacancies on Telegram, posted automatically every day. Free to join.
Join on Telegram ›